Asphalt drum mix plant manufacturer & exporter, Ahmedabad, India+91 98794 30770  |  sales@vinayakequipments.com

Mobile Concrete Batching Plant – CCBP 30 & 40

A compact, pre-wired concrete plant that starts producing in days and moves with your projects.

Call +91 98794 30770

Producing concrete in 3 to 4 days

The Vinayak mobile concrete batching plant, also called a compact concrete plant or mobile concrete mixer plant, is built for jobs that need quality concrete quickly and then move on. It takes 3 to 4 days to start concrete production and one day to dismantle.

The whole plant can be mounted on a single chassis (optional), with king pin attachment and pneumatic braking, and it comes fully pre-wired with a junction box and internal cabling.

Mobile concrete batching plant with twin-shaft mixer at site

Why a mobile batching plant

About 80% lower foundation cost

Compared with conventional stationary concrete batching plants.

Compact footprint

Less space needed for installation.

Lower transport costs

Lower cost to move the plant, and to haul concrete, because it sits close to the pour.

Dry mix capable

The plant can also produce dry mix concrete.

Technical specification

Mobile concrete batching plant technical specification
ComponentCCBP-30CCBP-40
Output & storage
Output (ideal, continuous)30 m³/h40 m³/h
Aggregate bins4 compartments / 28 m³4 compartments / 28 m³
Weighing
Aggregate load cells44
Cement / fly ash hopper500 kg, 3 load cells500 kg, 3 load cells
Water hopper200 L, 1 load cell200 L, 1 load cell
Additive container10 L, 1 load cell10 L, 1 load cell
Mixer & utilities
MixerSICOMA twin shaftSICOMA twin shaft
Capacity (charge / output, L)750 / 5001125 / 750
Cement screw conveyor with bag hopper219 mm / 5 MT219 mm / 5 MT
Air compressor3 HP3 HP
ControlPLC-based panelPLC-based panel
Connected load82.5 kVA82.5 kVA

Optional equipment

  • Cement storage silo
  • Silo accessories
  • Silo feeding system
  • Admixture dosing system
  • Water connection

Mobile concrete batching plant price

Price depends on model (CCBP-30 or CCBP-40), single-chassis mobility, silo and admixture options. Use the enquiry form for a quotation.

For higher outputs see the stationary concrete batching plant.

FAQ

Frequently asked questions

How long does a mobile concrete batching plant take to install?

About 3 to 4 days to start concrete production, and one day to dismantle.

What output does the mobile plant give?

CCBP-30 gives 30 m³/h and CCBP-40 gives 40 m³/h under ideal conditions and continuous operation.

Which mixer is used?

A SICOMA twin shaft mixer: 750/500 L on CCBP-30 and 1125/750 L on CCBP-40.

Related concrete plants

Need a concrete plant? Share your output and site.

Tell us the m³/h you need, the concrete grades and your site location, and the Vinayak team will send a quotation.

WhatsApp
Inquiry Now